Time:2023-03-25 source:Industry News Popular:display shelving wholesaler Views:525

The loft platform needs a lot of effort in the installation process because of its many parts and complex structure. Ningda summarized some key points of loft platform installation, which can simplify the complex procedures of loft platform installation.
1: Lighting. The lighting lamp is an essential equipment for the attic platform. In the installation, the position of the lighting lamp should be adjusted properly so as not to leave a dead corner in the attic. If the position of the lighting lamp on the drawing cannot cover the attic platform, the installation personnel should manually adjust the position of the lighting lamp. After the installation of the loft platform, the installation of all the shelves should be completed.
2: Stairs. In order to facilitate the installation of the attic platform, installing the attic stairs first can reduce the cost of installation time. It is suggested that the movable stairs can be installed first. For welding and fixing the stairs, the loft platform can be installed only after the installation is completed. To avoid the deviation of the passage distance, the stairs cannot be installed normally.
3: Laminated shelves in the attic. The attic platform will not be stored separately. Generally, in the storage environment, the upper layer of the attic platform will be equipped with laminated shelves for use. The installation of the laminated shelf can only be carried out after the completion of the loft planking and welding.
4: Structural positioning. The positioning of the attic platform is basic and needs to be carried out step by step. Blank space shall be reserved according to the actual situation in structure positioning. Similar to the through shelf, install the column first, and then graft the beam. Or alternatively, one column and one beam.
5: Chemical bolts are stable. After the column beam is installed, chemical bolts shall be used for drilling immediately. After the chemical bolts are punched, it is necessary to wait about 10 minutes before installing the attic platform parts.
6: Planking installation. The installation of planking is relatively easy. After installation, multi-point welding is required to ensure that the laminate will not produce friction or movement sound after being squeezed. During installation, the installation personnel need to continuously debug.
7: Installation of attic floor parts. The parts at the bottom of the attic are usually installed after the overall structure of the attic is completed, and can also be adjusted by itself.
Read recommendations:
Metal Wire Rack Freestanding Floor Bar Storage & Display Shelf
Last article:Storage shelves: "buffer" center of cargo circulation.heavy duty metal garage shelving
Next article:Daily maintenance and maintenance of warehousing shelves.for living 4-tier chrome wire shelf
Popular Recommended Products
4-Tier Hanging Garden Plant Stand Trolley Cart / Metal Plant Shelf / Plant Rack / Flower Pot Organiz
2021-05-31Metal Shoes Rack
2022-12-155-Tier Wire Closet Shelf Organizer With Hanging Rod Freestanding Open Wardrobe Organizer
2022-12-05Metal Utility Rolling Cart With Canvas Bag
2022-11-292-Tier Washing Machine Storage Rack with Hanging Rod, Hooks and baskets / Laundry Room Shelf Over Th
2022-11-11How to extend the service life of heavy-duty storage shelves?
2024-06-12steel wire shelf manufacturer.Why are automated stereoscopic storage devices so popular
2023-11-06Advantages of shelves
2022-12-143 types of attic shelves
2022-12-09wire mesh shelving unit Factory.wire shelving unit Factory.How does the shuttle rack work and what a
2023-11-03stainless steel wire shelf rack Factory
2023-04-123 tier wire shelving unit
2023-04-12stainless steel table with wire shelf
2023-03-25boltless steel shelving unit Solution
2023-04-12